Scroll to top

Waste water heat recuperation in the hotel

SES Urban

Waste water heat recuperation in the hotel

The calculation is made on the basis of a consolidated analysis of the audit reports of specialized companies. The calculation takes into account the peak loads for the hotel of the tourist destination.

 

General information about the object *:

Location Spain
Number of rooms 150
Number of people staying in the room 2
Average hotel occupancy by year 75%
Number of hotel stars 4

 

Technical information about the object *:

Hot water consumption per person 80 l
The ratio of hot water to cold 40/60
Cold water temperature 10 С
Temperature at the outlet of the boiler room 60 С
Wastewater temperature 25 С
Type of heat source Natural gas
The cost of energy 53 EUR ****
Boiler room efficiency 90%**

 

Estimated information on annual consumption:

Volume of hot water consumption 6 132 m3
Volume of wastewater per year 15 330 m3
Total amount of energy for heating 396,12 MW*h
Current water heating costs 20 994 EUR

 

Calculation of the efficiency of the installation of the recuperation system:

Type of system passive
Type of connection to the DHW system Plate heat exchanger
Recuperation power 36,11 kW
Total annual recuperation 106,95 MW*h
Savings from implementation 5 668 EUR
The cost of the system 22 000 EUR***
ROI 3,88 years

 

* The calculation is based on a summary analysis of the audit reports of specialized companies. The calculation takes into account peak loads for a tourist destination hotel.

** The weighted average value for typical equipment on the market is accepted

*** The value from the experience of previous installations of similar systems is accepted

**** All financial indicators are reflected without VAT

  • The cost of the system

    22000 EUR

  • ROI

    3.88 years

  • SAVINGS FROM IMPLEMENTATION:

    5668 EUR

  • TOTAL ANNUAL RECUPERATION:

    106,95 MW*h/year

  • RECUPERATION POWER:

    kW